5333 private links
Tesla’s 100 MW/129MWh Powerpack system near Jamestown in South Australia is proving to be so quick in providing backup power to the energy grid that 30-40% of the services it provides end up unpaid. The electric car and energy company claims that this is due to SA’s legacy utility billing system not being optimized for the big battery’s response time. //
Tesla’s earnings from its big battery installation currently follow the standards set by the Australian Energy Market Operator (AEMO), which breaks down a power provider’s response time into 6 seconds, 1 minute, and 5 minutes for energy to be fed into the grid. Tesla’s SA Powerpack farm near Jamestown, however, has been providing backup energy in as quick as 200 milliseconds. Thus, any amount of energy sent from Tesla’s battery into the grid that lasts between 200 milliseconds and 6 seconds is just too quick to be registered according to AEMO’s current specifications.